All 4 tomahawk carry Ohio class subs now forward deployed. 614? tomahawks, plus special ops personnel on board.
5mw TRR (Teheran Research Reactor) two refueling cycles, byproducts include @ 0.6 kg/yr element 239. 2003 Unclass IAEA (US Senate?) report included Iran unreported possession undeclared chemical separation technology/equipment element 239.
Last fall "fizzle yield" test declared failure MSM, @ size for trigger. Seismic event 4.6/7.
11Feb2010 NE Iran small earthquake, 4.6/7, initial 1km depth, changed to ("default")
10km.
US test "Bravo" some details on composition of 1st US test. Note please carefully the HEU level for the casing.
This was era of slide rules,manual machine tools, no computer real time analysis, nor were there helpful friends with junk military surplus, explosive lens designers, and missile test designs and facilities, not to forget: CNC machining centers.
Heavy water found at Qom. 6k + gallons. Iran mines lithium.
Draw your own conclusions from analysis of above.
Don't worry, be happy: Everyone KNOWS Iran is years away from 95%HEU enrichment.