Thread: RPD Build Run
View Single Post
 
Old 03-02-2011, 05:06 PM   #7 (permalink)
pirate56
Administrator
 
pirate56's Avatar
 
Join Date: Dec 2004
Posts: 4,996
iTrader: 31 / 100%
Default

The receivers came in today, it will take a few days to prep them for assembly, they need to be engraved, blasted, the bbl holes need to be reamed and honed and a couple of machine operations need to be done.

+ YouTube Video
ERROR: If you can see this, then YouTube is down or you don't have Flash installed.
Attached Images
File Type: jpg DSC01071.jpg (209.4 KB, 41 views)
File Type: jpg DSC01077.jpg (90.2 KB, 39 views)
__________________
[Only registered and activated users can see links. ]
pirate56 is offline   Reply With Quote